
- 27
- 0
Kathy CarlsonChapter 9
It was late on a Saturday morning in August when the main trunk sewer let go. The Higgins company was digging a utilities trench to be used to connect the new building with the utilities in the street. Although the trench paralleled the sewer line, it was several feet away from it. But it proved to be too close. Unbeknownst to anyone, the sewer was already near collapse before their work ever began. Although there was no frost in Los Angeles there was the constant pounding of motor vehicle...