A Critical PathChapter 18 free porn video

This is a FigCaption - special HTML5 tag for Image (like short description, you can remove it)

Sally seemed to Nick to be her usual self on Monday morning. Megan knew better. Sally was outwardly cheerful but Megan could sense an underlying unhappiness. She did have to wonder though whether it was the thought of a lonely Christmas that was pulling Sally down.

She took Nick his mid-morning coffee and then took hers and one for Sally into Sally's office.

"Time for a break, love," she said.

Sally smiled wanly and pushed the hair back from her forehead. "I could do with one," she said. "There are parts of these plans that are very boring but I must go through them in detail."

"Did you enjoy Friday evening?"

"Yes and no. I loved talking to your David and Gareth as well but I hated the dance I had with Cliff. I'm not going to be left alone with him anywhere."

Megan noted the lack of reference to Nick but grinned back. "Well at least he shows taste," she said.

"Huh! Well, he can pick someone his own size who can bonk him on the nose."

"Well, he danced with Helen."

"Animals!"

Megan laughed. "Anyway, my love, what plans have you got for Christmas?"

"None really other than to pop over and see my Mum for a little while."

Megan paused as though digesting that remark and then said, "Would you like to join us for Christmas Day? Eileen's going to her in-laws. I don't know what Rhys is planning. David and I would love to have you with us. Just a couple of old fogies but the offer's there."

Sally felt her chest constrict. She had grown very fond of these two. Megan was always there for her in the office and the few times she had been with David had been wonderful. He was so gentle, protective and calm. He could be quite funny too.

"Oh, Megan," she said, "you don't want me there. I'm not family."

"So what? Eileen and her family won't be there and, as I say, I've no idea whether Rhys will be or not. Even if he is he'll be in another world."

Sally, despite herself, giggled. "Are you sure, Megan?"

"Sure as God made little apples. David would love it too, particularly if you brought your violin."

"Oh, Megan, thank you. I'd love to."

"Good and if you want to stay over for Boxing Day you're more than welcome."

Sally bit her lip and tried to smile at the same time. Megan reached out and covered her hand. "You're on," she said, "and that'll make our Christmas."

"Oh, Megan. I ... I don't know what to say."

"You don't have to say anything, love. We'll just be very happy to have you with us."

Sally withdrew her hand and squeezed Megan's. "Thank you, love," she whispered.

Megan went in to collect Nick's mug. "Sally's coming to us for Christmas Day and Boxing Day," she told him.

"Oh, Megan, I hope I didn't rush you into it."

"No, boss, you alerted me to the situation. We'll be more than happy to have her with us."

"Bless you, Megan, and David too."

"We'll enjoy having her. We're both very fond of her. OK, I've seen her do the wild cat business but that's grown less. She's actually a very sweet girl."

Nick merely nodded. Megan smiled inwardly. "And you know it, you daft man," she thought.

On Tuesday Nick drove over the Pennines to his parents' house. He was pretty much at peace. Marshall was picking up and he was confident that they would be invited to tender for the two county council road jobs. It was time to invite the CEO to visit as a further morale booster. Christmas should be fun. Apart from his beloved parents his sister Catriona, her husband, Jerry, and their two children, Robbie aged four and Nina aged two, would be there. He had not seen them since last Christmas so there would be fascinating changes to the children. He got on well with Jerry too but the main reason for his happiness would be seeing Catriona. They were very close and she had been there for him when Veronica had left him. Once again anger coursed through him.

This was a new experience for him, anger with and at Veronica. The instance after the Christmas Party had surprised him. Previously any thought of her brought sadness and wishful thinking of what might have been. The anger was almost cathartic. It was liberating and invigorating: much better then mournful wistfulness.

There were carols on the radio and he sang along with them in the bass part feeling very pleased with himself that he could do it successfully with an inanimate object.

He arrived just before lunch as planned and was warmly and lovingly greeted. Matilda his parents' elderly Labrador, despite her arthritis, was clearly thrilled to see him and shadowed him for half an hour before collapsing in a tired but contented heap.

The children were wildly excited and became even more so when he asked them to help him carry in the presents from the car and put them under the tree.

"Which mine?" demanded Nina.

"Wait and see."

"Why Unca Nick?"

"Because it's not Christmas until tomorrow."

She pouted momentarily and then scampered off to the tree to put the present she was carrying under it.

Robbie proudly carried three presents. He was a big strong boy, wasn't he?

After lunch the two women went back to their labours in the kitchen. Apart from Christmas lunch which would be cooked the following morning, Geraldine, Nick's mother, had to do the fancy bits of icing on the cake and make mince pies as well as prepare the evening meal. She was not going to let Christmas detract from dinner that evening.

The three men took the children for a walk. Nick was amazed at Nina's energy and stamina although Jerry did have to carry her a fair part of the way home but that did not stop her chattering away nineteen to the dozen.

"Having learnt to talk," said Jerry, "she never draws breath." If Catriona had been there he would have added, "just like her mother," and waited happily to be biffed.

Nigel, Nick's father, was not an engineer but was still very keen to learn how things were going at Liverpool. Geraldine tended to hog the telephone calls that Nick made. He was very proud of Nick's quick promotion but was well aware that this job could make him or break him. It was not until the children were being put to bed that he got the opportunity.

Nick told him what he had found and the steps he had taken to get rid of the dead wood, advertise the company and chase up work. He admitted that being invited to tender for the two supermarkets and the two road improvements was only half the battle. They had to win the contracts and then execute them faultlessly before he could feel confident that he had put Marshall of Liverpool back where it should be. He told of his reorganisation and of installing Sally as his technical assistant.

Nigel listened spellbound. The way Nick talked showed his confidence in succeeding. His praise for his managers was encouraging too. Nigel threw in some searching questions. Nick fielded them without batting an eyelid. Nigel was thrilled and his pride in Nick increased even more.

Jerry had been present during the second half of the conversation. He was impressed too.

"What legal support do you have?" he asked.

"None that I'm aware of. We haven't needed any so far."

"Don't you get anyone to check your contracts?

Same as A Critical Path
Chapter 18 Videos

4 years ago
  • 0
  • 27
  • 0

Critical Update

You sit in front of your PC, placing a cup of coffee nearby. Looking at the screen makes you grin - it's only 3%, that's everything you need to wait for the newest update of your favorite MMO game. It took almost two hours. This update was announced long time ago and player were waiting with anticipation. You want to know what it will give you. But installation is still on. Bored of waiting, you move on your account on the graphic forum, where you post the pictures of your characters....

4 years ago
  • 0
  • 56
  • 0

MATTHEWS RETURN

My big brother Matthew is on leave from the Marines. He regaled us with stories of how many cocks he's had since last we've seen him. "I've had a virtual U.N. of cocks up my ass," he jolingly said. He especially loved all of the Japanese sex clubs. All the petite Lady boys swooned at the sight at any American soldier stepping through their doors. Matthew wanted to go AWOL and just live in these clubs. It was paradise to have all these adoring boys crawling over him without the slightset...

3 years ago
  • 0
  • 26
  • 0

An Unusual Seduction X

Once we finished breakfast we all sat around and made small talk.  I knew what was on everybody's mind - sex.  Some days Carol is near insatiable.John asked, "What did you two this morning?"Carol said, "Dick finger-fucked me to orgasm and I sucked his cock until he came all over me."Underneath his T-shirt John's cock twitched.Carol's robe fell off one shoulder and her bare tit was on full display.  John stared at Carol and his face was flushed.  I looked at both of them and thought,...

MILF
4 years ago
  • 0
  • 25
  • 0

A New Taste Part 3

A week later I serviced Nicks divine dick once more. He had the day to himself and inited me to his flat. The risk was an additional pleasure for him as was being completely naked. I was fully clothed as usual. He talked a lot as I slurped and sucked my way towards his satisfaction. He even took a call and shuffled me backwards towards his balcony window as he conversed about his plans. His friend had no idea that Nick was pulling my head on to his prick so that my lips gapped at the base of...

2 years ago
  • 0
  • 27
  • 0

Sauna Operation OverlordChapter 3

They had chosen a night without moonlight; their night-vision glasses provided all of the visual acuity they needed, even depth perception. The two transport helicopters had them in position before 1:00 AM, and they began their launch. Dick sent their best two jumpers out first to hit the landing zone and protect it for the rest of the troop as they landed. Of course, if they had to do any protecting at all, the whole operation was shot out the window. Secrecy was the number one priority...

4 years ago
  • 0
  • 53
  • 0

Joyce on the Pill

“I need my twenty bucks, you got it?” “Uh, you said I had till Saturday to pay it back, I don’t get paid at work until Friday, I don’t have it.” “I know I said you could give it back Saturday but I really need some money today, do you have any? Five bucks maybe?” “Huh! I only have a ten.” “Come on Joyce, I really need it.” She gave in “Shit. Okay give me my bag.” Her shoulder bag was setting on the top of her dresser so I reached up to grab it. I picked it up but one of the handles was...

4 years ago
  • 0
  • 56
  • 0

Sarah Carerra 327 A Very Carerra Chorus

Please email me at AngelJediGirl (at) gmail (dot) com before posting this story to any other site. Posting to a pay site is prohibited. Comments and suggestions are also welcome at the above email address. --- Sarah Carerra Book 3 - Concerto in A- By Megan Campbell (Released: November 12, 2012) Chapter 27 - A Very Carerra Chorus The first few days of November felt almost normal, or at least like what I remembered normal to be before Sarah came into my life. The only thing...

4 years ago
  • 0
  • 27
  • 0

The Making of a Fuck Toy 2

Chapter Four – A meeting of Mind and BodyWhen Morning came around for Cass, it was brutal. She’d not slept much thinking about what had happened to her. She was disgusted with herself and the way he’d made her behave. He being, Big Mr. Eric French. Taking advantage of helpless women, Mr. French. She thought. Yeah, Mr. Drop Dead Gorgeous Mr. French. But the fact was, she’d thought about him all night. She’d brought herself off so many times, thinking about how he made her feel. She felt alive...

2 years ago
  • 0
  • 24
  • 0

Meaty Toy

My wife is a gorgeous woman from the Philippines. She is 5 feet three inches tall and weighs 105 pounds. She has large C cup breasts with very prominent nipples that will poke through a heavy sweater and has no public hair. A few years ago, she started to pluck her public hairs as well as her arm pits and is now bald and smooth. I am a fairly good looking Caucasian standing six feet tall and weigh 185 pounds. I am well endowed with a 2 inch thick, 7 ½” cock that is bent slightly up and left. ...

2 years ago
  • 0
  • 28
  • 0

Going Back In Time

I was fortunate enough to secure a position as the night porter at a home for elderly well to do Jewish people. I was the only non-Jewish person in the place. I was twenty-three when I started my new job. My duties were limited to nothing more than security, and if a resident pressed the alarm button I along with the duty matron would investigate what the problem was. Even though I was not of their faith I was warmly welcomed to the home.There was one lady in particular who was very helpful and...

Incest
4 years ago
  • 0
  • 26
  • 0

Infamous

This whole thing started about three months ago. My boyfriend, Nick, and I decided we would make a sex tape. We’d been together for five years and it was always a huge fantasy of his so for our fifth anniversary, I agreed to it. I was not too crazy about the idea but I had laid down some ground rules for him to agree to. The rules were as followed: 1. The video would be recorded to my personal computer and he could not have his own copy. The meant we could watch it together or not at all. That...

Exhibitionism
3 years ago
  • 0
  • 23
  • 0

Surprise ending to the evening

A short story from a trip to the states....It happened this weekend, I had some girlfriends in town from San Diego and we met up with some guys they knew who go to my school who I'd never met before. On Saturday night, we all went clubbing and then to a little afterparty but we all winded up back at my place to crash.One of the new guys (We'll call him Rob) was flirting with me most of the weekend. I really wasn't that into him at first, he was a little too preppy for me, but we ended up...

Anal
2 years ago
  • 0
  • 39
  • 0

GroupMams

Group Mams! Some things in life are best done in groups. Some examples are team sports, heavy drinking, cult creation, and most importantly of all, sex. I'm unsure if my readers can even properly imagine having group sex. Single sex is so far from the realms of possibility for you that group sex sounds like a fairy tale.Well, let me be the one to tell you that it's no fairy tale. Group sex happens all the time, and I'm involved in a surprisingly large percentage of it. Group sex is my favorite...

Premium Gangbang Porn Sites
4 years ago
  • 0
  • 37
  • 0

Soft Swing

This is the story oft a couple’s initiation into the world of swinging. Sam and I both thought they were an unlikely couple to try swinging but we were wrong. We were introduced to them by a member of our group to gauge their interest. This is their story from the perspective of the wife of the couple based on conversations we had after our encounter. Hope you enjoy. My name is Megan and my husband is Bryan. I’m 5’ 6” about 150 pounds with strawberry hair, fair skin and glasses. My Bryan is 5’...

Wife Lovers
3 years ago
  • 0
  • 30
  • 0

MORE WASHROOM ENCOUNTERS

7 X 6 JERK OFF One day in 2009 I went to the washroom I the mall and stand at the 1st urinal in a group of 4. There is nobody else in there. Finally, a guy comes in and he stands at the urinal beside me. I look at him and he looks at me - he's got a beauty in his hand - it's an incredible fat uncut piece of meat. I can't help myself, I reach over and indicate to him that I'd like to jerk him off. He turns towards me and I grab his cock and start "choking his chicken". Since nobody is in there,...

3 years ago
  • 0
  • 27
  • 0

New PleasuresChapter 20

"What have you been up to now?" I asked the crestfallen Rhea, who was sat with the secretary in the office outside the headmistresses' study. She had been crying, clearly, but there was a mark of defiance in her body language that made me apprehensive. Like so many things Rhea did, there was going to be a complicated explanation to this. "Where's Mum?" she asked, ignoring my question. "Earls Court probably. I haven't been able to reach her. Her mobile is dead," I replied answering...

3 years ago
  • 0
  • 28
  • 0

Episode 164 Sex in Paris part 2

This story continues from ‘Episode 163 - Sex in Paris’, where Giselle was brutally gang-banged against her will in a Paris Sperm Donation centre and has undergone very successful vaginal reconstruction.The story contains a graphic [email protected] scene - you could skip the first section if easily offended...Tony is still in the Sperm Donation Booth with his step-sister Sam and Giselle outside operating the control console.Giselle and her trans girlfriend-with-a-cock Yasmin plan their...

4 years ago
  • 0
  • 24
  • 0

Charity AuctionChapter 13

"Time to go get sold, slut," a voice called out, awakening Tulsa from her restless, dream-filled slumber. She rolled off the bed and assumed a kneeling position at the man's feet, raising her head so he could snap a leash onto her collar. "Up and turn," he said, handing her a pair of impossibly high seven inch platform shoes with seven inch spiked heels. Tulsa took the shoes in her hand and then turned to face away from him. "Put the shoes on," she was told, bending at the waist and...

2 years ago
  • 0
  • 27
  • 0

Eros University Chapter 1

Enyo gets accepted to a secret university of sex, depravity, and seduction, full of hot schoolgirls in short, skimpy uniforms, hunky males, and sexy full-breasted teachers. First year promises to be a blast…. Chapter 1: A Mysterious Letter Whoever got accepted to a university they didn’t apply to? Apparently, I did. Last year in high-school I was burdened with the decision of choosing the best university for my future but just couldn’t come to a conclusion. At first it was a variety of...

2 years ago
  • 0
  • 22
  • 0

The Morning After

Disclaimer: This is fiction. If you can't deal with erotica, then you should go visit someplace else. This story involves graphic encounters between men and women, men dressed as women, M-M-F Bisexual sex and solo sex. If these things don't turn you on, then this story isn't for you. Author's Note: Shameless Plugs and Other Stuff. If you haven't read "Yet Another Halloween Story," stop and do so now. Not only is it a (warning, shameless plug) fabulous story, but this story...

2 years ago
  • 0
  • 26
  • 0

Learning CurvesChapter 62

The pounding on Phil’s apartment door stirred him off the couch where he had sat only a moment before. He opened the door to find a wide-eyed Lisa standing on his doorstep. “Hide me!” she urged, pushing past him and into the apartment. He noticed a handprint on the side of her face and he saw red. “Who did this?” he seethed. Lisa’s eyes were red from her tears and she shook her head. “Was it your father?” Lisa’s eyes glanced away and Phil had his answer. He would deal with that...

3 years ago
  • 0
  • 57
  • 0

Nylon Lexis sissy training part 4

I was untied from the bench and sir liften me up onto my heels and led me over to some stocks. I was made to kneel down and my wrist and neck placed in the stocks, then he closed them down on me and clicked it shut. He gave my ass a slap as he pulled the hook out of my tight hole and grabbed my waist. I shivered as I felt his cock press against my stretched hole. In one movement he pushed his cock into my boy pussy up to the hilt and held it there. My ass pushed back against him, squeezing it...

2 years ago
  • 0
  • 34
  • 0

Teddys WorldChapter 17 Cars Houses New Students Asking For Painful Lessons

We all were at my parent’s house that night, the house was crowded, but the parents were glad we were there. My Mom wanted to know where her Cougar was. “You ordered eighteen of them; I know one of them had better show up here!” She thankfully went upstairs the matter settled to her. I took my Dad aside and told him where he was expected at Dan Pfeiffer to sign for four new 1979 Mercury Cougars XR-7’s while they were midnight blue with blue interior with a padded midnight blue vinyl Landau...

3 years ago
  • 0
  • 20
  • 0

The CurseChapter 17

'Since when is it s crime to invite a woman down to my car?' Mal thought, 'she's over 16 and I never forced her?' But this scene was looking bad for him and he knew he needed to talk fast and convincingly. Already he could hear people coming down the driveway and a voice calling out for Anna. "Hey!" he yelled, "down here! I need some help here!" Someone came running. He saw it was Mick and not far behind, the cute little bass player from The Curse. Several more people were coming,...

4 years ago
  • 0
  • 25
  • 0

Johnny Comes Marching Home

There is no sex in this story. The young man in this story is not Rambo. He is a brave American who like so many others have served their country proudly. * Johnny thought back to the last time he had seen the McKuens. It had been just over three years ago. It was right at the time he was enlisting in the Army. Johnny had just graduated high school and wanted to follow in the footsteps of his father, uncle and grandfather. They had all served their country. Johnny’s mother wasn’t too pleased...

2 years ago
  • 0
  • 54
  • 0

Tenchi Muyo All Good ThingsChapter 40 Fear This

In her room, Ayeka paused regarding herself in her full-length mirror. With the original destruction of Reyo, she had gone for the longest time unable to stand the sight of any artifacts, which they had managed to reclaim from the wreckage. So when Misaki's mirror had been recovered, seeing it broken covered in muck, only seemed to vigorously salt an open wound. She had no idea at the time it could be restored in such a fashion! She was a princess, not an artisan after all! So when Tenchi...

4 years ago
  • 0
  • 42
  • 0

Houston 3Chapter 7 A Night at the Club

"What are you going to wear to the... err, party tonight, Argie?" "I'm glad you asked. I spent most of the day shopping, and I think I'll wow them with what I wound up with." "You do know that you'll be naked for the most part, don't you?" "Of course I do, darling. But first impressions count for a lot. And I want to impress the women there. Are they all couples? I mean husbands and wives?" "For the most part, yes, I believe they left room for... um, stag members. At least...

2 years ago
  • 0
  • 24
  • 0

2070 The Tale of Seven Part Four

Edward woke her gently by suckling at her nipples while his fingertips danced along the soft skin of her inner thighs. Her soft moans were erotic, and he wanted to simply ravage her. He had to remind himself that he had promised her that he would show her what it meant to make love.She was beautiful and he couldn’t help but wonder about a government that would allow a sixteen-year-old to agree to be sold as a Privately Owned Sex Toy without giving herself a chance to find love and be happy.She...

Fantasy & Sci-Fi
2 years ago
  • 0
  • 24
  • 0

Fortune Cookie Revised Part 17

The Fortune Cookie 1 (Revised) Part 17 Paul awoke Friday morning having slept happily all night. The experience of going out last night as Paula had been enjoyable to say the least. But the best was to come, for Paula was going to a birthday party/sleepover tonight. The thought of which seemed to settle him for the day. His parents feared he may refuse to dress in his boys clothes as was the case last time, but not this time. "Morning mom," he said as he arrived in the kitchen to...

4 years ago
  • 0
  • 25
  • 0

Accidental Sex With Sexy And Horny Cousin

Hi, I am Avi (name changed) 22 years old currently residing in Hyderabad. This is my first story in ISS so any suggestions regarding my writing are welcome. Now coming to the story. This happened in the month of May 2018. My cousin sister Rashmi (name changed) was visiting Hyderabad for some personal work and was staying at a hotel near Begumpet. My cousin is married for the last 10 years and has two kids. Still, she has maintained her figure. Her complexion is white and her stats are...

Incest
2 years ago
  • 0
  • 25
  • 0

Getting Tangled in the Tinsel

In late November all Suzy thinks about is Christmas. Suzy loves Putting up the tree, and Christmas lights all around the house. This year is no different, but a new guy is in her life.Gary is thirty and very handsome. Suzy met him at work. They have been dating for six months now. Everyone is happy for them, parents, co-workers even Max. Max was Suzy’s boyfriend until Gary came to town.Max played the nice guy very well. Some say a little too well. Max was fifty and knew Suzy was too young for...

Quickie Sex
2 years ago
  • 0
  • 15
  • 0

HotMilfsFuck Julia Eat My Pussy and Say MMMbop

The best thing about MILFs is that they are chock full of personality, and our girl Julia here won’t just squeeze every ounce of baby batter outta you, she’ll have you laughing your ass off all night too. You would think if she’s this outgoing and sexy she must be getting laid left and right, right? As a matter of fact the last time this cat mom’s gotten her own little kitty purring was way back in January, so again, we graciously accept the honor of stretching her tight slit back to life...

xmoviesforyou
4 years ago
  • 0
  • 29
  • 0

Quest For KnowledgeChapter 6

"Shit," Nilsen muttered as he watched the retreating backs of his twin sisters. Turning back he sighed and looked at the woman sitting up in his bed. She had the hint of a smile on her lips and had allowed the sheet to fall down uncovering her very large, and from the looks of them, firm, breasts. "Damn," he said crossly, "you can at least cover yourself up. If you don't want men to stare at your breasts then you shouldn't flaunt them." Rather than the expected angry response, or at...

2 years ago
  • 0
  • 48
  • 0

Hindsight 2020 Book 3Chapter 4

With the wedding coming up quickly, I felt bad that we couldn't invite a lot of our new friends and co-workers. As Darcy, Beth, and Lilly headed out to Bermuda to go over last-minute arrangements, they left me to play the role of a bachelor. Much to her dismay, Karen had to stay and work. That night, as we were riding home from the office together, I pointed her to the Frontier hotel. We went in and had a nice dinner. Karen wasn't afraid of men, but she didn't lust after them. We talked...

4 years ago
  • 0
  • 24
  • 0

Road RashChapter 19

The celebration party at Anne and Lizzie’s place was in full swing, but for some reason, I just didn’t feel much like partying. Maybe I was feeling my age, maybe I was just tired from all the hours in the saddle I had spent in the last month? And maybe I was feeling a little guilty about what we had done to John? Anyway, I was standing on the patio looking out over the surrounding hills when Melody, Jane, and Beth finally found me. “Here you are!” said Melody as she snuggled into my right...

2 years ago
  • 0
  • 14
  • 0

Dead Meat

Dead Meat By Margaret Jeanette Katherine Lubbock sat at her desk talking to Jerry Smith who sat across from her. He handed her an envelope, which contained pictures. She looked at all of the pictures. They were of her husband having sex with three different women. She had suspected he was cheating on her so she had hired Jerry who was the best private investigator in town. He left and she wondered about what to do with her husband of eight years. She didn't want to divorce him...

4 years ago
  • 0
  • 32
  • 0

Ice Changes Everything

I thought someone had been on my computer as it had been wrongly shut down, but who my wife always closes the machine down as per my instructions so I never suspected it would have been her. As for doing anything in the future to my instruction Jean had other ideas, but that jumping too far ahead and a little too premature. So in the end I just put this feeling down to my machine having a bad day. Nothing out of the normal happened, my wife was her usual self, life carried on totally...

2 years ago
  • 0
  • 27
  • 0

BadDaddyPOV Marica Hase Little Japanese Princess

Sexy Asian girl Marica Hase is in her princess costume. She wants her step dad to play with her. This horny babe knows how to seduce her step dad and wants to use his cock as her favorite toy. It doesn’t take long for the Asian slut to be on her knees showing her step daddy how good she is at sucking cock. The young slut’s step daddy stuffs her tight little pussy and nails her hard. Sexy Marica moans and enjoys every second of this. Marica doesn’t want this play time to end....

xmoviesforyou
2 years ago
  • 0
  • 29
  • 0

The Juxtaposition of Gender

It all started at the Halloween Party. We were both frantically looking for costumes but could not find a decent one. Three hours before the party, Erica and I decided to just dress up in each others clothes. She borrowed my shirt, I borrowed her blouse. She wore my shorts, I wore her skirt. She insisted I had to wear her bra to make it look realistic. I complied only if she wore my boxers. She agreed, but under the condition that I also wore her panties. Not before long, we were both...

3 years ago
  • 0
  • 24
  • 0

Katharyna

Katharyna von Arbenis erwachte schweißgebatet in ihrem Bett. Die Laken des Bettes lagen wild durcheinander und waren mit blauem Dämonensperma über und über verschmiert. Auch ihr eigene Körper war nicht verschont geblieben: von ihrem lieblichen Gesicht über ihre mächtigen Brüste und ihren flachen Bauch bis zu ihren langen Beinen. Alles war mit Sperma besudelt. Sie schaute sich um und erkannte drei Käfige aus schimmerndem Licht, in dem je ein Dämon kauerte und auf seine Befehle wartete. Die...

4 years ago
  • 0
  • 26
  • 0

New StartChapter 8

Frank came out of the house to greet us a drink in his hand and a big smile on his face. "Paul how are you?" we shook hands before he turned to Katie and kissed her hand. "And the gorgeous little Katie, let me look at you m'dear" I'll admit to a silly pang of jealousy as he held her at arms length and looked her up and down. "You're a stunning young lady Katie, I think you're father is a very lucky man indeed!" I cleared my throat and he took the hint, "The three girls are in...

4 years ago
  • 0
  • 28
  • 0

The Determined Man Part 2

Part 2 of my longer, character led story, The Determined Man. For readers of some of my other stories, please note that this part of this story does not contain any racy scenes. Please do persevere! I have written most of the whole story. I will be posting further parts regularly and it most certainly does get to where we all (or at least most of us) want it to get to. Personally I think it is all the better for establishing character and building tension before we get there. For those...

4 years ago
  • 0
  • 39
  • 0

The Throne Their Anniversary

For my birthday, my husband had made me a facesitting throne. Knowing how much effort it took to make it, I suggested we might also use it for some femdom on our anniversary weekend. We had explored both sides of dominance, and this would be an occasion to go further.As usual, our anniversary celebration would be just the two of us at home. A few days before, we presented each other with relevant gifts. He gave me a dildo gag.“It’s for me, of course,” he said when I looked surprised. “Well,...

Femdom
2 years ago
  • 0
  • 27
  • 0

The Western Bureau of Trans Affairs

The Western Bureau of Trans Affairs The class was deadly silent as they waited; they had already spent two weeks in this training camp from hell. Out of 100 students, 43 of them were left. It was meant to weed out the weak and those lacking in their ideological duty. A loud smack was heard as the door opened, two troops walking and standing on each side of the door. A young woman, a cigarette clenched in her teeth, her uniform shaped to her amble body frame, enunciating her chest, as...

2 years ago
  • 0
  • 21
  • 0

HornyHousehold Gia DiBella Fucking The Tight Teen Ass Of My Filipina Italian Stepsister

Sexy petite Filipina Italiana slut Gia Dibella starts off undressing herself, and then playing with her toys. She uses the hitachi on her clit, while using her glass toy in her ass. After that, Gia puts her butt plug in, and gets dressed to meet up with her date, Conor Coxxx. He shows her some things on his phone, and then they start kissing and undressing. He licks her clit and fingers her pussy. After that, Gia gets on her knees and starts sucking his big cock. Its not long before the horny...

xmoviesforyou
2 years ago
  • 0
  • 28
  • 0

The Annual Company Picnic

This story takes place in a future time, and a future place where consensual torture is the means of personal advancement. It’s only a fantasy, and so don’t try to replicate it in reality!1It was the day of the annual company picnic, a warm humid July Saturday afternoon. Karyn had been a faithful employee of the company for nearly six years and hadn’t missed a single affair.  For the last three years, her workmate and closest friend Debbi had accompanied her, as she did to most social...

2 years ago
  • 0
  • 16
  • 0

Biology Lesson

Sarah came home from school to find Bill sitting on the lounge wanking himself, calling her name. She ran to her room and closed the door. She loved her daddy and wanted so much to fuck him. How could she make it look like it was all right and still have her way with him? She thought for a minute and came up with a plan. What if she had an assignment where she had to learn how to fuck a man? She could try it out on Daddy; after all he was a man in her life. And had been for 18 years.Sarah left...

Incest
4 years ago
  • 0
  • 20
  • 0

Flights of Consciousness Book III Charitable Good DeedsChapter 6

David and Nora sat on a sofa in the Hyatt lobby talking quietly. Nora said, "In a few minutes a Lebanese named Yuusif Hashem will come into the hotel, walk directly to the elevator and take one of the cars to an upper floor. The room where he meets another Arab named Widdaud Ahmad changes for each meeting. I'll point Yuusif out, and you can connect with him tonight and wander around in his past, present, and future. Yuusif is a member of Hezbollah, a terrorist organization backed by Syria...

2 years ago
  • 0
  • 46
  • 0

The Librarian Part 2

Why is she staring at me? I didn't have room to talk, because I couldn't help but stare back. My parents used to tell me it was love at first sight when they met. I never believed that could happen to me... until today. Walking up the stairs to the second floor of a library I'd never been to, the last thing I expected to see was the most stunning woman I had ever seen in my twenty years of life. There was an awkward silence before she spoke. "Yes. How may I help you?" On top of being drop-dead...

Mature
3 years ago
  • 0
  • 27
  • 0

Z New HorizonsChapter 23 Kimi Mel

Five people fit into their shower easily. Alice and I practically gave each other orgasms while washing. Kimi and Fran together washed Mel and each other. Mel found an interesting (and very sexy) way to kiss Kimi. Instead of bending over, he picked her up. Mel was so stiff I was afraid he would cum in the shower. As we were drying, Mel asked Alice to get that little step stool we use to reach high items. Mel put Kimi on it. The increased height allowed Mel to kiss Kimi more easily. Mel told...

3 years ago
  • 0
  • 25
  • 0

Transition to Tall GrassChapter 3

The first shot had gotten Tall Grass in the chest. The second bullet had gone thru one thigh and dug into the other. Tall Grass put two rounds in the two men and whistled. Black Rock moved to his preplanned second position, but Tall Grass did not move to his. One leg stung. The other burned. His chest was on fire and he had difficulty breathing. Tall Grass took the two large bandages from his first aid pouch. He tied the first one around his leg and with the second he covered the hole in...

2 years ago
  • 0
  • 46
  • 0

Gf Ki Bhabhi Ko Jamkar Choda

Hello friends , Ye meri pheli story hai. Jisko bhi achi lage wo please apna feedback zarur dena. Meri id h Id maine ldki k naam se banai hui hai , for safety and security reasons.   Sbse phele apne baare me batata hu , main 24 saal ka hu , mera lund 6.5 inch ka h aur mota hai . Mujhe bhabhiyo ki chut chatne me bahut maza aata hai.   To ab shuru karta hu story. Baat aaj se 4 mahine phele ki h , meri g.F ka exam centre madhya pradesh me pada. Gharwalo ne akele jane se mana kiya to usne apni...

1 year ago
  • 0
  • 21
  • 0

Angel Chapter 7

The rest of the week seemed to go by in a blur. Johanna and I spent our time shopping, catching up with some of my old friends and more often than not, I spent as much time with Josh as possible and Jo spent time with Brian. This was often difficult for her because his girlfriend Lacey made an appearance at the house several times during the week. Brian played it cool and Johanna stayed out of the way. She knew that Lacey wasn’t as good in bed as she was and Brian had told her so on many of...

Erotic
3 years ago
  • 0
  • 32
  • 0

A Wish Unwanted Part 10

A Wish Unwanted - Part 10 by Limbo's Mistress Hand in hand, Lee escorted me over to the passenger side of the Mustang, opened the door, then closed it once I was seated inside. Jogging around the front of the car, he climbed in behind the wheel, and we were soon on our way to the party. I was really thankful that he'd offered to pick me up. Penny might have been to Jacob's house a dozen or more times, but Sam never had. All I knew was that he lived right...

3 years ago
  • 0
  • 26
  • 0

Meeting David

I get home, tired from the office…our earlier conversation has left me wanting more, but first I need to relax…I head off to the shower, tossing my clothes in the laundry basket…. The shower feels good.. Warm water trickling my back… my mind begins to wander, and I can’t help touching my body sensuously .. thinking of your hands touching, washing me…. You quietly enter the room … careful not to make a noise to alert me that you’re there…pausing by the laundry basket, you pick up my panties…...

4 years ago
  • 0
  • 25
  • 0

Caught with Consequences Pt VI

Caught with Consequences Pt VI By Teaser Thug number one marched us down the hall in front of him. I kept looking over towards Debbie to see if I could get some kind of signal on just what the hell to do. But she seemed too preoccupied by our new 'friend' to notice. He'd walk us past a door, stop us, and try the lock. If it were locked, we'd move on. Finally we came to a door with an electronic combination. He pulled some kind of remote control device from his pocket. He aimed...

3 years ago
  • 0
  • 26
  • 0

The Price of Opening Up Victoria

THREE WEEKS BEFORE VICTORIA’S OPENING A few weeks before I took my little sister-in-law Victoria’s virginity, I was in bed beside Alice, my wife of 18 months. Alice is a strikingly attractive 23 year old with a great body. Men were always eyeing her up. She is about 5 foot 6 with long dark hair that is down to her lower back. Like her younger sister Victoria, she has fine feature with large vivid blue eyes and lips just meant for kissing. As you would expect for a girl 7 years older, her...

3 years ago
  • 0
  • 14
  • 0

park 5

minutes passed the pain turned into lust i started slowly turning my hips whilst impalled on him gyrating slowly oh oh oh my god its so nice .... Yeh baby ur so sluty he said that made me push onto him just a little more then some more then even more untill all 12 inch was inside my anal cavity my ass was touching his big balls i was truely impalled with no chance of movement i slowly rocked forward feelin every lumpy vein as i went .... Right up untill i reached the rim of his helmet which...

Porn Trends