Critical Modification Chapter 1
- 3 years ago
- 6
- 0
Sally was entranced by the painting. She noticed that the prince and the harpist were both sitting on actual bulges of rock from the cave wall. She wondered if they had really done that. Then she realised that the artist had used the surface of the rock to show folds in the men's clothes. She took more photographs of this clever and very effective demonstration of his skill.
So enthralled was she that she never heard the rattle of falling stones. She did hear the bang though when the roof of the cave cracked just at the end of the entrance shaft. She whirled upright at the noise and stared petrified at the cascade of small rocks falling from it. She was unable to move. Dimly she heard someone call her name but still she stood.
Nick saw her standing in a state of shock. He did not waste time shouting again but sprinted the remaining ten yards and, flinging her over his shoulder in a fireman's lift headed as fast as he could for the entrance. He was half way there when the second bang echoed through the cave and the shaft followed by the roar of tumbling rock.
"Dust!" he thought, swung Sally round and pressed her face into his chest so that his clothing would act as a partial filter. He himself took a deep breath and ploughed on.
They were enveloped in swirling dust but Nick could still dimly discern daylight. He stumbled on, his chest on fire and, just when he thought he would have to draw breath, they were clear. He veered to the right and collapsed managing to twist Sally so that she was on top of him. He gently rolled her to the ground.
They were both wracked by coughing, gasping for air in between. Gareth and David were beside them in an instant and carried them further away and upwind of the shaft entrance.
"Water!" said Gareth, "and lots of it."
David dashed away grabbing two of the gathering crowd to help him.
Sally lay where she was in deep shock. Nick managed to get to his hands and knees and then sit back on his ankles. He pulled a clean handkerchief from the breast pocket of his suit jacket, shook it out and held it to Sally's nose.
"Blow!" he ordered.
She did nothing.
"Blow!" He shouted at her.
She started and did as she was told.
"Again, Sally, and harder," Nick said sharply.
She obeyed.
Nick gave her the handkerchief and rather more gently said, "Keep doing it, my little tiger, "and see if you can cough up some more."
He took another handkerchief from his trouser pocket and blew his own nose hard several times.
David arrived back with six bottles of water. "The lads are bringing some more," he said.
Sally was incapable of drinking herself and Gareth sat down and nursed her. Nick drank greedily and then had another major bout of coughing and spitting. He took another drink.
"David," he asked, "could you wash my eyes?"
David sat down and took his head and neck across his legs. He held Nick's left eye open and gently poured water on it. He let go and Nick blinked carefully.
"A bit more," he said and David complied.
"Much better! Now the other one please, David."
David complied and they repeated the double dose.
"Thanks, David," said Nick. "I feel human again. Sally love, how are you doing?"
There was no response. She was still too shocked.
"Hot sweet tea," said David. He looked round. "Bryn?"
"Yes, David." He sprinted off.
"Hywel!"
"Yes, David."
"Get a gang and seal off the entrance."
"OK."
A dozen men moved away.
"Huw! Call for an ambulance."
Huw walked quickly away.
Nick was still feeling groggy but he could now see and breathe reasonably. He turned his attention to Sally again. Gareth was still gently rinsing her eyes.
Nick took her hand. "How are you doing, little one?" he asked softly.
There was no answer but a slight squeeze of his hand.
Nick tightened his hold on it slightly. "It's all over now, Little Tiger," he said quietly. "We're both safe. There's nothing to worry about."
There was another slight squeeze of his hand. Nick moved round so that he could hold her.
"Thanks, Gareth," he said. "I'll hold her now."
He held her in the crook of his left arm. "Someone's gone to get you a nice cup of tea. That'll make you feel a lot better."
"Is it teatime?" asked Sally weakly.
"Yes, Sally love."
"What happened?"
"The cave collapsed but I managed to grab you before it did?"
"Oh! Is Megan all right?"
"Yes, love. She's fine."
"Good. What happened?"
"The cave collapsed but I managed to grab you before it did?"
"Oh!"
"Shock," whispered Nick to Gareth. "Almost like concussion."
Huw returned. "Ambulance coming from Bangor," he said to Gareth, "but it could be half an hour."
"Thanks, Huw. Well done.
Bryn arrived with a mug of tea.
"Thanks," murmured Nick taking it from him. "Have a drink of this, Sally."
He held the mug to her lips and she took a sip.
"More, Sally love."
Her hand tightened momentarily and she drank more.
"Good girl. And some more."
She obediently did so.
"That's my girl. More?"
She nodded and drank again.
"Well done, little one. Would you like some more?"
She nodded.
Nick managed to get her to drink the best part of half a pint. She fell asleep and he continued to hold her. He was feeling desperately tired and a bit shivery himself. He drank the rest of the tea.
"Gareth," he said. "I've no doubt the ambulance boys will want to take me along as well for a check up and that we'll be in overnight."
Gareth nodded.
"Would you give Megan a ring and tell her what's happened. Ask her to ask Norman to stand in for me temporarily. I should be back tomorrow anyway but if I'm not..."
"Don't rush it, Nick."
"I won't. I want to be able to keep an eye on Sally."
"Sure."
"Would you ask Megan also to tell the CEO what's happened and that I'll be in touch with him one way or another tomorrow?"
"OK."
"That painting's gone, Nick. Even if you clear back in I'm pretty sure that cave will have collapsed."
Gareth nodded. "What about Sally's photos?"
"I reckon she dropped her mobile when I grabbed her. By all means look for it but I reckon it's under several tons of rock."
"So what do we tell the press?"
"You can tell the truth or you can just say that there was a rock fall and that your manager and his tech assistant just managed to get out."
"But the boys may talk about the painting."
"If they do it's unlikely to be believed. Most people think that cave painting went out with the Stone Age. If you're pressed, admit it but say that we're not prepared to spend time, money or risk lives trying to go back in there because the chances are ninety-nine point nine percent that it's been destroyed. The CEO will probably handle the PR and send someone down here immediately. In which case, 'No comment' until he arrives other than to admit that there has been a rock fall but that nobody has been hurt."
Gareth nodded. "OK, Nick. Got it. How are you feeling?"
"A bit bent but OK."
"And you saved Sally."
"Thank God!"
Gareth patted him on the shoulder. "And thank you, Nick. I'm sure she will when she's better." He grinned. "Bloody soldiers. Always into the heroics."
"Balls!" said Nick but smiled tiredly.
There was silence then but it was not long before the ambulance arrived and whisked them away. Charlie drove sadly back to Liverpool on his own.
Nick sat in the ambulance and nodded off into a fitful sleep. Sally was out for the count. The ambulance man reassured Nick that that was the best thing she could do.
You sit in front of your PC, placing a cup of coffee nearby. Looking at the screen makes you grin - it's only 3%, that's everything you need to wait for the newest update of your favorite MMO game. It took almost two hours. This update was announced long time ago and player were waiting with anticipation. You want to know what it will give you. But installation is still on. Bored of waiting, you move on your account on the graphic forum, where you post the pictures of your characters....
Here is 19yr old 1 st timer Isabelle Ryan in her debut scene showing her goods to the world with fan favorite Amina Fara. This girl has a knockout body and SPECTACULAR tits, and I mean SPECTACULAR! This girl is not so innocent but oh so slutty and the JJay puts her through the paces as she sucks her first cock and licks her first slit on camera. This scene is hot and you know we brought her back to exploit all her holes on www.blackambush.com. Who doesn’t love getting their cock sucked by...
xmoviesforyouCHAPTER I: The Arrival It was completely dark outside, an almost moonless night, as he walked up to the front door at the prescribed time standing intrepidly before ringing the bell to announce himself. Her request that he arrive barefoot, wearing only his pajama bottoms and a t-shirt caused him to shiver and had caused his his nipples to harden rub against his shirt when his feet hit the cold cement on the path to Her door. She had also instructed that he arrive with the black plug that was...
We pushed Mr. Bemis’s herd into the cow pens on the north side of El Paso, around noon on the seventh day of my trip back in time. Once we had the cattle all accounted for, Mr. Bemis spotted each of us drovers a five-dollar advance on our pay, and sent us off so he could negotiate with the buyers. I figured I was making some headway towards fixing my bad reputation, when a couple of the other cowboys invited me to hit the saloon with them. I put them off by telling them I’d be there in a...
The next morning found Hyandai awake before Harlen again. She laid there a moment, enjoying herself being held. She smiled to herself, thinking that she would not mind waking this way many, many more times. His strong arms were wrapped around her from beneath and above, and she was pulled tight to him. She knew that they had not been thus all night, but were certainly in this very position for much of it. Her hand stroked the forearm nearest her face, and she watched the tiny hairs bounce...
As the group gathered in the reception hall, a number of people appeared, entering the room from its main entrance. Kevin and Denise looked at them curiously, but Amelia grabbed Kevin’s arm. “It’s the prime minister!” she whispered to him in shock. “The education secretary too!” Wixom entered the room following Grayson, ushering in several other distinguished-looking individuals. Grayson, with Wixom at her elbow, walked up to Amelia and took her hands. “Wonderful to see you again, Amelia,...
Finals and the funerals of the seven who died dampened my spirits the week after the Pickle attack. Joey insisted he go to the funerals despite never having met any of them personally, except possibly to test them with the coin that they had died for. Suzi and/or I went with him, but we each separately couldn't make one due to conflicts in final schedules. Sarah went to all but two, and several other people from the Group made it to them as well. Like I said, it dampened my spirits, and...
Valerie had been paying the bills for Ray's design work for over six months. Ray had finished the job after four weeks but repayments, sex with my wife, would last a year. Both Val and I had happily agreed to the deal. We both, Ray and I, wanted to widen Val's sexual boundaries and Ray had done that. It started with Ray fucking Valerie twice a week and now he fucked her as much if not more than me. Ray loved to take photos of Valerie naked to share with his friends. Initially the fact men I...
Hi my name is Satish friends, I had my 1st sex with Shama and it was her first too. Before I proceed further, I would like to tell my early exp of sex. I began to feel the heat after passing 9th class then I began to feel strange sensation in my penis and the girls looked more lovely now. I would look at their breasts and dreamt in my own way. My lund had started getting erection nd it wd jump to touch my naval. When i started masturbating, i dont remember now. In those days i lived in a...
Mai Kamini hoon 25 saal ki ek khoobsoorat mahila. Abhi teen saal pahle hi meri shaadi Arvind Babu se hui hai. Arvind Railway me ek achchhe post par karya karte hain. Hame govt ki taraf se rahne ke liye ek kafi bada banglow mila hua tha. Mai shadi ke do saal baad gaona hne par apne pati kesaath rahne a gayee thi. Mai ek bahut hi sexy ladki hoon. Meri shadi se pahle kai ladkon se affair rahe the. Shadi se pahle mere ek boyfriend ne meri seal todi thi. Shadi ke baad jab mera pati wapas chala gaya...
On the way home I made a couple of stops. First, I picked up some red hair dye. Next, I stopped at a used car lot where I was known. I sold my car. I asked them to hold it for a few minutes and I would be back to get my things out of it. They said it was no problem. There was a car rental place just down the street. I walked down and rented a good sized van for one week. I told them I would drop it at their dealer in another town. That would be fine. I put it on my credit card so I didn't...
"Sorry we're late," said Sarah's Clan as they met Lorelei, Earl, Virginia and Doug at the entrance to the dining room. "You aren't," replied Lorelei, "as we just arrived." After they exchanged hugs, the group entered the dining room and went to the serving line. Virginia said, "I am always amazed by the great selection of food." "We can arrange for you to have reconstituted freeze dried stuff," replied Jill, chuckling. "Thank you very much, but I'll pass." Claudette said,...
My phone rang, I reached an arm out from under the bed clothes and answered it, "Neil Barker is not here and if you want a Taxi you can sod off" I announced sleepily trying to imitate an answer-phone, expecting the call to be from Harry asking me to do a Taxi run for him. "Its Elsie, you replied to my email." a small female voice announced. "Elsie, what email," I struggled to shake the sleep from my head. "The one replying to me on the bondage site." "Oh, its one a.m....
Scarsdale, New York: Sunday 21st October 2018Of the four of us, I must have been the last one to see that there was already someone waiting for us in the private room. I was bringing up the rear, Francis up front pushing Grace in the wheelchair and Sue sandwiched in the middle.“James, what are you doing here?” Francis’ deep voice boomed out, the tone of his voice matching the surprised look on his face.“Honestly, I’m not too sure. Grace texted me and asked me to come over to meet you all. I’m a...
Wife Lovers(Authors: This is set to private, but if you would like to write for this story feel free to message me. There are plenty of other adventures, missions and exploits to be had. All characters are 18 years of age or older.) Sunken far below the depths of the surface, a devious monastic order of female changelings makes their home and thrives: The Sisterhood of the Broken Mask. They number almost a hundred strong, with two dozen mindless thralls and a horde of bloodthirsty monsters to protect them...
This is a small story that kind of came to me in my dreams, and when I woke up I felt like I had to write it down. So here it is with few adds. What a strange dream you might think...well not really, it combines two great interests I have, history and sex xD And please note that English is not my native language, so if I have done any mistakes on grammar or spelling, dont blame me ;)--------------------------------------------The war was on its fourth year, but it was now said to be nearing its...
Candy had been quiet all week, but I could tell she was looking forward to more action. She had been quite brazen about this. Come to think of it, so had Yukiko and Vicky. Robert and I were in a quandary. Without telling any of the girls we met that week. There was no denying that we were having a blast with these three girls, that was a given. Yet this could be dangerous. The girls seemed quite excited to take this, way beyond what we, or they, ever imagined. We couldn't call this off, nor...
I am going to try to tell this as best as I can remember, it was about four years ago. My boyfriend and I had been broken up several weeks. I was over my mad/hurt feelings and was now missing the sex that I used to have pretty much every day so I decided that Saturday night I was going to a club and hopefully hookup with a hot guy to satisfy my needs. I planned to look really hot that night so Sat morning I had my nails done and bought a new, black lacy/sheer demi bra and matching thong. ...
I needed some help one day. I thought maybe Alex would be home. I remember sucking his cock at Christmas. He tasted so good then maybe he will taste just as good now. I went outside to see if he was in his yard. I walked around for a little while and then I noticed him pruning some bushes. I yelled over and he got up and came over towards me. He asked if there was a problem. I didn't want to come out and say that I wanted his big cock. I said no ptoblem but I could use his help getting some...
On a hot sunday afternoon I realized that I had run out of food. I had decided to go to my local Super WalMart since i needed a few additional items. On this day i had also picked out my favorite little pink halter dress..yes..it was a lil short and hardly covered my 38D breasts but i love it anyway. As i had walked into walmart i was so busy talking on my cell i had forgotten to get my shopping cart. So, as i walk back to the front..i realized that i had quite a few older men checking me out....
Anna loves sex. A routine trip provides her a new opportunity for excitement.I am Ric and this story is mostly about my wife Anna. My wife Anna and I visited my old college recently. It is in a small southern town. I had some alumni business and Anna was along just for fun.Let me tell you something about Anna. She is 5’4’’ tall. She weighs about 140 pounds. She is blonde now greying. She is beautiful at 59-years-old. Her tits are 36c and very sensitive. Her nipples are exquisite. And she has a...
MatureAll of my stories are true. Obviously, names will be changed and nobody can be identified but I thought maybe someone will appreciate what I've lived through. XoxoSo, I was laying in my bed with this middle-aged guy two days ago. I met him at a bar that night and I knew from the moment I saw him that he would be sucking on my clit by the end of the night. We didn't even talk very long before i took his hand and slipped it up my dress. You'll learn that I never wear panties when I wear dresses...
Margaret looked up from the bed. She was still panting a bit, slightly out of breath from the last 30 minutes of sex with her husband Rick. Her chest was still rising and falling and it made her already large breasts look bigger. She and Rick have been married for 18 years and early until just a year ago the sex was ok, yes, just ok, but Rick is a good man, a good father, a good provider and sex had never really been a priority for her. She enjoyed it but since it was pretty much the same each...
MasturbationShe lays there... tied up. Her wrists and ankles bound and she is blindfolded. He is so turned on by having her naked and completely helpless. He has fantasized about this for a long time. He begins by lightly caressing her. Starting with her cheeks, his fingertips move onto her jawline. However, he avoids those beautiful lips of hers. He gently strokes her ears and then moves down to her neck. As his gentle caresses continue, he can her soft sighs, and some quiet moans. As his touch on...
Straight SexA Rocky Road "Hey these knickers aren't mine!" I said going through the underwear my wife Annette had just washed for me and handing back the yellow panties with the grey lace trim that I had just found. "That's alright but you may need to wear them when you run out of clean underwear, Dave," she replied handing them back. "I made sure that they are your dress size," she added showing me the label. "See you are a 14 with a 38c cut." I could see a number 14 was clearly visible...
Chapter 4 Conrad’s Business Meeting Conrad Gentner double-parked his 1982 burgundy Cadillac in front of the Spanish Grocery, and waited with taillights flashing amid slow traffic that would build in volume within the next ten minutes when the factory down the block let its workers go for the day. He reminded himself to be tactful when Harrigan showed up. Tact was not necessarily Gentner’s long suit and he knew it. He was known to be more flamboyant than anything else, although anyone who...
(Author's note: I have given Jeanne a new look. A story on that will follow later.) The red Panoz Roadster sports car made its way up the winding road leading to the Sanctum of Souls monastery. Inside were two women, dresses suspiciously conservative if you knew them better. Driving the car was an energetic redhead with a smile on her face with a smile on her face constituent of both smugness and excessive joy. Her red hair was frizzy and not well kept, and she was wearing a black...
Julia held the letter I'd sent her in her hands. Well, it was more like an explanatory note, as I had just given it to her. It was a couple of pages, as I wanted to fully explain what I was thinking and give details about the offer. She'd had it a couple of days, long enough to think about it before we met. I was nervous, as I often got in tense situations. That's one reason I'd written out the note, so I could word it correctly to provide all the right information and express...
‘Um…hi,’ John said. Perhaps not the most articulate of beginnings, but John felt like his brain had just dried up. Despite having exchanged dozens of emails and hundreds of instant messages, this was the first time he’d ever spoken with Deanna ‘live’, and he had to admit, he’d felt a rush of nervousness when the phone rang. Somehow, the thought of voice-to-voice contact felt more…intimate, in a way that made him worry that he was maybe investing too much into just one phone call. He couldn’t...
What a day at the lodge. The sun is just rising above the wild scene. Outside birds are chirping and the leaves of the trees rustle in a light breeze. The cobbling water from the stream provides a soft background sound. You lie on your stomach, naked. I am naked as well. I softly kiss your neck, then your shoulders, and down your back. I nibble your beautiful butt and you turn around and laugh. I move to your side, place one hand under your shoulders and the other under your knees. I lift you...
Since that summer afternoon in Paradise, Em and I have not only grown closer as friends, we have also come to learn a lot about each other and things we had suddenly found ourselves curious about. Our parents were none the wiser although Anna knew since we had shared our secret with her and only her since she was Emma's twin sister and my friend too. Our oral and touch play continued very regularly since then and we had even let Anna be a part of it on occasion since she too was curious....
After dinner I've noticed that the wine is starting to take effect. You're slowly letting go of you inhibitions, and curiosity is taking over. You pose the question of the eye hooks that in the door frame to my bed room. I reply that's to tie you up. The image in your mind makes you blush a little, but the grin on your face says that you're just curious enough. Taking you by the hand I lead you down the hall. Stopping at the door I push you against the wall with a firm kiss. Our tongues trading...
BDSMWe had been hanging around her house all this weekend doing nothing. When I learned later that this was her graduation weekend, it became clear to me why she was acting so mysteriously. She felt that something important had to happen to her to punctuate her growing up and out of high-school. Her older sister, Bobbie, had been fucking my roommate for months now, taking off her clothes and sucking his cock at the drop of a hat. They would come in to the apartment, and she would be on him within...
First TimeSo yesterday I met my very first black daddy :) this story is very, very real. It happened Sunday, September 23 2018. In Las Vegas, NV.It was about 3 pm when I got there. He lived in retirement housing apartments in downtown Las Vegas so he came out and found me in the parking lot. I didn’t know what he was going to think of me, but he shook my hand and said nice to meet you. He told me to follow him. He let me into his apartment and I started to take off my shorts when he asks me if I wore...
Monday, April 4, 2005 When I awoke Monday morning, I think the first conscious thought any of us had was, It's such a nice way to wake up, knowing you've got full-on sex to look forward to later the same day. I was the first one to the breakfast table this morning, after Mom of course, so I oh so casually told Mom, "I'll probably go to Julia's after school today." Probably indeed! Wild horses couldn't keep me away. Mom...
I've been thinking about a new series for a while. This new series will be a series of one offs focused on teens being exploited by adults whom they should have been able to trust. This will be the first installment, so let me know if I should continue with this project.Jenny O'Brian watched as her teenage son Danny scrambled to recheck his backpack for the third time, and for the third time he found that everything that he needed for the week ahead was packed inside. It made her smile to see...
After talking to friends about my sleepover experiences, I quickly discovered how different mine had been. For me, I didn't go over to a friend's house just to stay up late, watch movies, play video games, and eat pizza until the early hours. I initially had thought that but my first time sleeping over turned into many first times.....I was thirteen when I had my first sleepover. It was a youth group event, where there were two boys (me included) and three girls ( at one of the girl's house )....
Author’s Note 2: Although this fantasy can be read independently, it was written as part of a series. For full enjoyment, please read “The Barbie Lez Fantasies: Week 1-102”. *** Have you ever had one of those fantasies? You know, the ones that feel so real you begin to wonder if you are actually imagining them. Well, I do… because I have them all the time! Sometimes, they turn into a story, but mostly they remain trapped inside my brain. That is, until now… Many of you may not be...
Betty had thought it quite funny at the time. She and Martha, both sixty-five-years-old, had joined other granny-aged women and men at the Spanish class organised by the local social group. Everyone in the group was at least in their sixties, and some much older.Catalina had agreed to run the classes. She was eighteen-years-old and a student at the local college, and thought that helping all the oldies would be good fun, as well as good training for her chosen career as a teacher. However, she...
Spanking“I’m Kylie, and I’m a sex addict.” I tried not to cry. It would have made things exponentially more embarrassing than just standing in front of the room telling a group of strangers that I was basically a sexual deviant. I bit down on my lower lip instead, producing just enough sharp discomfort to keep the girly tears back. I couldn’t believe I had really committed to this. Of course, I guess one could argue that I wasn’t very good with commitments, as it was. Ever since the depraved incident...
Group SexThe week went by slowly as I digested what Jim had done to me last Saturday. As I walked around school, I found myself looking at people differently, wondering if any of them had ever been treated the way I had. This would always bring the details of what Jim had done to my mind and my cock would immediately start to respond. I had started making sure I always had a book or a coat to hold in front of my crotch, and walked around in almost perpetual shame.The showers after gym were the worst. I...
Hi friends main Puja Kaur hu aur main Punjabi hun. Mere ghar mein mere alawa meri mummy, badi didi, aur mera bhai. Jo mujhse bada hai aur didi se chota hai. Mere papa bachpan mein hi hume chhod kar chale gaye the. Uske baad meri mummy ne hi hume paal posh kar bada kiya. Meri didi ka naam Rani hai. Abhi 23 saal ki hai aur woh private job karti hai. Unki salary 8000 rupaye hai aur aj kal unki salary se hi hamara ghar chal raha hai. Kyunki meri mummy aj kal kafi bimar rehte hai. Mere bhai ka naam...
The middle forests of Anshar were a wonderland of trees that soared high into the sky on thick tall trunks and then shot in all directions with branches creating thin canopies of rustling leaves. Often thick purple vines with white four petal flowers that drooped like rain droplets encircled the trees. The floor of the forest had ferns in the deep shadows alongside bushes that snagged at a person from his ankles to his shoulders. The cries and calls of the forest creatures were often loud and...
Hi! I am new to this erotic story writing. But this is a real incident that happened to me and I am eager to tell my experience. I was new at college and didn’t know how much fun the college life would be. School life had always been under some strict rules though as kids we had fun but under certain restriction. In college we don’t need our parents to be with us if we go on some trip and no time restriction is there as for how long we can interact with our friends. It was my first year at...
Phil, Jack, Rachel, and I were in a giggle fit once we realized that we had all chosen the same outfit, each in a different color. "I can't believe we all picked out the same PJs for our slumber party" Rachel said. That was it! That's why tonight's dinner was special! I remember now that Rachel called it a girls' night in. I wasn't sure what she had meant by that until now, but still... there was only one girl here, not much of a girls night I though to myself. "Ummm, Rachel, I...
You may want to read the previous chapters first to better understand this story. This is the final chapter to this story. Thank you to those who stayed with me through all five chapters. Hope it was worth your time. Again I want to thank Mistress Lynn for editing this very difficult story. * ‘Moose, did you see or talk to Jerome, Mel or Terri after that day?’ I asked. ‘I saw Jerome at work, but we never talked about me fucking Terri. He thanked me for the money many times and told me about...
My first time (And this is Genuine, I assure you) I dressed under my normal clothes and took a rucksack with other bit's & pieces in and went to a nearby "Cottage" that had 2 Glory Holes, when I got there, it was empty, so I went in the middle cubicle, finished dressing: Stockings & Suspenders, High Heeled Lace up PVC Boots, PVC Basque etc.I didn't have to wait long, the cubicle's then got occupied either side, through the peep holes in the door, I could see at least 2 other guys at the...
Everyone was coming in carrying multiple bags. My Mom spotted me heading toward them in the kitchen and said, "No, Ral. Out." I stopped and doubled back automatically. My conditioning to do just what she said all during my childhood had kicked in and I kowtowed to her will. A second later, I was mad. How could I just give in to what she wanted? I didn't have to do what she said any more. I was an adult and if she couldn't accept that then she would have to just put up with it. I turned...
I woke up the next morning, with my cock poking at Gail’s ass, spooning her a little from behind as she rubbed my cock. I rolled on my back, and Gail pulled the sheet over her, lowering herself down to my cock, wrapping her lips around it.It felt like my cock had been hard for the last ten hours, fucking Gail, Liv, and Becky. They’d been relentless since they came back from clubbing the night before.I slid my hand down to Gail’s ass and rubbed her pussy. Her moans on my cock were sending...
SwingersMy name is Ed and I’m divorced with joint custody of our daughter. My ex-wife is a smoking hot sex pot that I could never leave my hands off. Even after years of marriage we still fucked almost every day, and sometimes I even shared her with my buddies (one at a time). I know she had some brief affairs, but she was discrete and never refused me whatever I wanted, so I didn’t mind too much. The thing that ended the marriage was money. I made plenty, that wasn’t the problem. The problem was...
The canteen filled with the hustle and bustle of sagging figures, broken thoughts and repressed relationships. Bog-standard nourishment was supplied and tables were monitored closely; we weren’t allowed to fraternise or talk about any subject they deemed as prohibited. I picked at my shepherds pie just hoping that one day they’ll listen to me when I say I’m a vegetarian. I look around hopefully; to see if someone might come and sit with me. Nobody does though, nobody ever does. I bite into a...
Masturbation(Lyrics) "Whisper to me softly, three words upon my skin. No one's near and listening so please, don't say goodbye. Just hold me close and love me, press your lips to mine. Mmmmmmmmmmmmmm, feels so right. Feels so right." I stretched up from where I had been resting my head on my husband Mike's chest and kissed him lightly. He gave a sigh that rumbled deep in that same chest and stroked my hair. I put my head back down and listened to him breathe. That breathing was a lot calmer and...
,Life can sometimes present us with painful changes in fortune, without warning, and that was the case with my wife and me. My name is Ed and I was twenty years old when I got my eighteen-year-old wife, Hannah, pregnant. Most people would assume that we would be destined to have a hard life financially. As it turned out, I'm a very good home builder and businessman, and created a lucrative construction business. By the time I was thirty years old, we were one of the wealthiest families where we...
Cuckold"It's been a month since your last flogging, Clemmy" said Alexia encouragingly. As she spoke, she was looking at that strong and much whipped back, running the tips of her fingers down the ridge of the spine, making Clementine shiver pleasurably. Her skin might have been thickened and desensitised after the savage treatment it had endured of late, but she could still enjoy those sweet caresses from Alexia! No matter what abuse had been heaped on it, Clementine's back was still a very...
Hello all, I’m so sorry that I haven’t written. I’m working every day now, and have my boys in afternoon, so I’ve been busy. I ‘ve been thinking about all of the hard cocks out here who enjoy my stories, and how I’ve been depriving them. This story took place 2 years ago, in late Summer. As I told you in a previous story, there is a park near my house.(The same park as in my last story). Actually its a large, wooded area with a pond and alot of walking trails. There are also alot of little...
As she opens it, she is taken back by the beauty that stands before her. Dawn is a tall blonde with a great body and currently only wearing a bath robe. Dawn steps forward into the room and closes the door behind her. She then pulls the knot on her robe and reveals her sexy body to Chris. Chris instantly turns as red as a sports car as she takes in the exposed skin and boldness that has presented itself to her. Dawn says that “I heard you through the wall and had to connect a face and body to...
I collapsed on theground where Alex and Laurie lay panting. My body no longer wanted to move after the morning of sex. I glanced up to see some of the upper years enjoying each other’s bodies, but mostly the girls were getting dressed. The other three sluts and I lay on the ground, panting from the morning we’ve had. From one fuck to the next, I have been used all morning. And I have loved every minute of it. As I lay there panting, I began to get a sense of my surroundings, and how my body...
"Hey, Mom?" she asked, poking her head my bedroom. "Dad is in the shower, would you like to sneak in a quickie before he gets out?" I closed my eyes and bit my bottom lip for a few seconds. "Rose, there is something I need to tell you," I informed her, peeking back at her. "What, Mom?" she asked, coming in there with me. "You were walking in the hallway naked?" "I tend to get gutsy when it comes to having sex with my mom," she informed me, sitting down with me. "She is smoking...