Robledo MountainChapter 14
Taking down the adobe bricks from the cave entrance, I thought about the next step that I dreaded so much. A heavy door of wood and adobe bricks was going to need sturdy support from the wood door jamb it was going to be hung on, which meant burying the jamb a minimum of nine inches. Digging down into nine inches of rock was not going to be easy. I started digging the hole for the left support jamb using the largest cold chisel and the heaviest hammer I had. The floor here didn’t seem to be...