A Boy and his dungeon XX
Things settled out over the next week or so. Concrete was poured, electricity was brought into a panel and distributed through the dungeon, duct work went in carrying away stale air and bringing in fresh. A small building, matching the look of the house and old garden shed was erected to hide the top of the lift and the fans for the ventilation system. Phone lines were brought in and a system installed that let us call between phones as well as allow several calls at once. We all took a...